Planning a rear, side or two-storey extension? This guide covers what an extension really costs in Dublin, when you need planning permission, who you need on the team and how long each stage takes.

Call now and we will connect you with a local builder.

  • 📍 Coverage Area: Dublin
  • 💶 Typical Cost: €60,000–€140,000
  • 🛠️ Response Type: Local vetted operators
  • 🛡️ Standards: Certified & insured tradespeople

[Builder] in Dublin

Our vetted local tradespeople cover Dublin, ready to get your issue assessed and resolved as quickly as possible.

  • Typical cost: €60,000–€140,000
  • Worked cost example for a 25m² extension
  • Planning rules and exemptions explained
  • Step-by-step process and timeline

How an extension project works, step by step

Most extension problems, from budget overruns to disputes with builders, come from skipping the early steps. Getting the design, permissions and scope fixed before a builder starts is the single best way to protect your budget.

  1. Set your brief and budget. Decide what the space is for, roughly how big it needs to be, and the most you can spend. Keep 10–15% back as a contingency.
  2. Get a design. An architect or architectural technologist turns the brief into drawings. For a simple single-storey extension, design fees typically run 5–10% of the build cost.
  3. Check planning. Your designer confirms whether the extension is exempt or needs planning permission. A planning application usually takes 8–12 weeks to decide, longer if there is an appeal.
  4. Bring in an engineer. Foundations, steel beams and any opening into the existing house need a structural engineer's design.
  5. Prepare tender drawings and a specification. These describe exactly what is included: insulation, windows, heating, finishes. Without them, builders' quotes can't be compared fairly.
  6. Get at least three quotes. Compare them line by line, not just on the total.
  7. Sign a written contract. The RIAI or a similar standard form sets out price, programme, stage payments and how changes are handled.
  8. Build. Groundworks and foundations, walls, roof, windows, first-fix services, plastering, second fix, then finishes.
  9. Snag and sign off. Walk the job with your designer, list defects, and hold back a small retention until they're fixed. Get completion certificates for building regulations, electrics and any gas work.

What to check before you hire a builder

  • Get quotes based on the same drawings and specification so they can be compared
  • Check the builder is on the Construction Industry Register Ireland (CIRI)
  • Ask for public and employers' liability insurance certificates
  • Agree stage payments tied to work completed, never large upfront deposits
  • Hold back a retention (often 2.5–5%) until snags are fixed
  • Make sure your designer certifies compliance at the end

What an extension costs: a worked example

As a rough guide, a finished single-storey extension in Dublin costs around €2,500–€3,500 per square metre including 13.5% VAT, before the kitchen. Here is how a typical 25m² rear kitchen-dining extension on a semi-detached house might break down:

ItemTypical cost
Build: foundations, walls, roof, insulation, plastering€45,000–€60,000
Glazing: sliding or folding doors and rooflights€8,000–€20,000
Opening into the house and steel beam€4,000–€8,000
Heating, electrics and plumbing€6,000–€10,000
Flooring and decoration€3,000–€7,000
Design, engineer and certification fees€6,000–€12,000
Total before kitchen€72,000–€117,000
New kitchen (optional)€15,000–€40,000

What pushes the price up:

  • Two storeys, or a complex roof such as a pitched roof with valleys
  • Large areas of glazing or high-end aluminium doors
  • Poor ground, nearby trees or drains under the extension footprint
  • Restricted access, such as a mid-terrace house with no side entrance
  • Underfloor heating or a heat pump
  • Changes made after the build starts

These are indicative 2026 Dublin ranges. A quote based on your drawings is the only reliable figure.

Planning, building regulations and timelines

Planning permission and building regulations

Rear extensions can be exempt from planning permission if, among other conditions, the total floor area of extensions to the house stays within 40 square metres, enough private garden is left (at least 25 square metres), and height and boundary limits are met. Upstairs extensions have tighter size and distance limits. If the house has been extended before, that floor area counts towards the limit.

You will usually need planning permission for side extensions to the front building line, anything over the exempt limits, and work on protected structures or in architectural conservation areas. Your designer or the council's planning department can confirm.

Every extension must meet the Building Regulations, whether it needs planning or not. Larger projects also need a Commencement Notice and certification under the Building Control rules, so make sure your designer confirms what applies to you.

How long it takes

StageTypical time
Design and engineer4–8 weeks
Planning permission (if needed)8–16 weeks
Tendering and choosing a builder3–6 weeks
Build on site12–16 weeks for single-storey

Exempt projects can be on site within three months of starting the design. Projects that need planning usually take six to nine months from first drawings to a builder starting.

We cover house extension in every area below. Choose your district for local information.

DistrictAreas covered
North Dublin CityArtane, Cabra, Clontarf, Coolock, Drumcondra, East Wall, Fairview, Glasnevin, Phibsborough, Stoneybatter
Dublin North CoastRaheny, Baldoyle, Donaghmede, Howth, Sutton, Portmarnock, Malahide
North County DublinSwords, Lusk, Rush, Skerries
Dublin 15Blanchardstown, Castleknock, Mulhuddart, Ongar, Hansfield, Ashtown
West Dublin & LeixlipChapelizod, Palmerstown, Lucan, Leixlip, Adamstown, Clondalkin
South West DublinTallaght, Citywest, Firhouse, Knocklyon, Ballyboden, Templeogue, Walkinstown, Kimmage, Rathfarnham, Terenure
South Dublin CityBallsbridge, Donnybrook, Sandymount, Ranelagh, Rathgar, Harold's Cross, Churchtown, Dundrum
Dún Laoghaire & South CoastBlackrock, Booterstown, Monkstown, Dún Laoghaire, Dalkey, Killiney
Stillorgan, Sandyford & FoxrockMount Merrion, Stillorgan, Goatstown, Sandyford, Cherrywood, Cabinteely, Foxrock, Deansgrange

Related builder services:

Need House Extension in Dublin?

Call now and we will help connect you quickly.

Call Now: 083 056 8710

Get help with house extension

Tell us about the project, your area and your timeline, and we will come back to you.

What do you need help with?

Please choose what you need help with.

Please tell us where the property is.

When are you hoping to start?

Please choose when you'd like to start.

Do you own the property?

Please choose an option.

Urgent? Call 083 056 8710, the fastest way to reach us.

Rough budget (optional)
Where are you with the project? (optional)

Please enter your first name.

Please enter a valid phone number.

Please enter a valid email address.

Please tick to agree so we can pass your details to a contractor.

Thanks, we've got your details

We'll match you with a vetted local contractor and be in touch shortly.

For anything urgent, call 083 056 8710.

Frequently Asked Questions

How much does a house extension cost in Dublin?

A finished single-storey extension typically costs €2,500–€3,500 per square metre including VAT. A 25m² rear extension usually comes to €72,000–€117,000 before a new kitchen.

Do I need planning permission for a rear extension?

Not always. Rear extensions within 40 square metres in total, leaving at least 25 square metres of garden and meeting height and boundary limits, can be exempt. Check with your designer or council.

Do I need an architect for an extension?

You need someone qualified to produce drawings and an engineer for the structure. An architect or architectural technologist can also handle planning, tendering and certifying compliance.

Can I live in the house during an extension?

Usually, yes, for most of it. The disruption peaks when the opening into the house is made and the kitchen is moved, so many families plan a short stay elsewhere then.

Does an extension add value to my house?

A well-designed extension that adds useful living space usually adds value, especially in areas where moving is expensive. It rarely adds back more than it cost if the finish is very high-end.

What is a contingency and how much should I keep?

Money set aside for unexpected issues, such as poor ground or hidden drains. Keep 10–15% of the build cost in reserve.

Need [Builder] Services Across Dublin?

Call now for urgent help or browse the trade and area pages to find the right route for the work you need.

How Emergency Trade Works

Emergency Trade connects you with independent, vetted local tradespeople across Dublin and the rest of Dublin. Before any work starts, ask for a written quote and check the right registration for the job: RGII for gas work and Safe Electric for electrical work.